Selecting A System
Waste-to Energy system
The main clients of waste-to-energy systems are municipalities with solid waste, forest, agricultural organizations, and industrial plants that generate combustible wastes.
We look at the following criteria in selecting a viable system:
- the operational experience of the equipment manufacturer
- operation and maintenance of the systems
- an economic evaluation of the systems performance under comparable circumstances
- the customer's preferences
Implementation Program
An implementation proposal will be submitted to the client with the Schematic Design report. The implementation program will be an extension of the Schematic Design study for engineering services, supply of equipment, installation, startup and commissioning.
During the engineering design phase the installation and maintenance organizations will be consulted to ensure ease of installation and operation and maintenance.
The financing of the program will be tailored to the client’s requirements.
|