WTE DevelopersWaste To Energy Developers
|
|
The Feasibility StudyThe feasibility study sets the foundation of an energy system. WTE Developer's approach to the feasibility study combines a rigorous analytic methodology with the engineering Design. The following tasks are performed during this phase: For a given study, we do the following: Evaluate the client's energy consumption profile:
Perform the feasibility study:
Evaluate energy requirements for one year of operation
Investigate purchase, lease or investor funding options. Select the best available Waste-to-energy subsystems and perform a system economic evaluation:
See a sample feasibility study we presented at the 4th Biomass Conference of the Americas in partnership with Heuristic Engineering: |